+9614712157   |   +9614712158   |   +9613291016
Assignment Name:   Upgrading of water supply systems in Minnieh and Bhannine Municipalities ( Minnieh - Dennieh District - North Lebanon) Design & Supervision of the execution of the works
Country:   Lebanon
Name of Client:   CDR
Address:   Minnieh and Bhannine
Duration:   Start Date: March 15 2015
Completion Date: March 16 2016
Number of professional staff provided by the Consultant:   4
Narrative Description of the Project:  

Upon a tender launched by CISP, BTD was awarded the contract for designing El Minieh and Bhanine water system and supervising their construction. The project consists in allocating new water sources to supply the two localities and in conveying them to the existing reservoirs of the two localities.

Extensive geological and hydrogeological surveys were performed for the purpose of selecting 2 sites for drilling 2 water wells after having defined their depths and their yields.

These wells have been tested in October 2015 and yielded the first a flow of 35 l/sec and the second a flow of 25 l/sec.

Hydraulic designs were made to size the electromechanical equipments and the lift line, ender documents for the construction works were prepared and BTD contributed in evaluating the contractors proposals and finally supervised the construction works. Works have been handed over to the Water Establishment on March 24, 2016.

The cost of the works was 2.3 MUSD

 
© BTD - Bureau Technique pour le developpment 2023