Design and the construction supervision on the construction of two water reservoirs with their valve chambers in Maaroub . Each reservoir has a capacity of 2500 m3. The purpose of these two reservoirs is to supply water to 10 localities which population is estimated at 120,000 in 2035. The water sources lifted to these reservoirs are those extracted from Yanouh (Ouadi Jilo) pumpingstation.